The location of the land is located in a densely populated residential area that can be used as an apartment project or an adjacent townhouse.
• Land 1 part 10,345 m2 land allocation year (2056) pay 1 time office – warehouse
• The origin of the land purchased by the individual purchased and assigned to the company to be converted into a factory, not the land allocated by the state. This is private land.
• Newly built high-class factory.
• The factory has full standard infrastructure such as:
1. Fire protection system
2. Water supply and drainage system
3. Green tree system
4. 2 power stations (250 KVA and 560 KVA)
5. Factory insurance
6. Complete auxiliary system.
7. Office block and showroom 1000m2
8. Canteen
Leave feedback about this